What Actually Happens on Install Day
Last updated: May 23, 2026 · Reading time ~5 min
Pre-install (day before)
We confirm color, schedule, and access. If trees need trimming back, we mention it 48 hours ahead. We text or call the morning of with the ETA.
Hour 0-1: Setup and removal
Crew arrives. Sets up the coil machine in your driveway (needs about 25 ft of unobstructed space). Removes old gutters and downspouts. Inspects fascia closely — if any rot is found that wasn't visible during the original quote, we stop and discuss before proceeding.
Hour 1-5: Install
Hangers installed every 24" along all eaves. New seamless gutters cut to length and hung. Corner miters cut, riveted, and triple-sealed. Downspouts installed. End caps sealed.
Hour 5-7: Cleanup and walkthrough
Coil scraps removed. Yard magnetic-swept for screws. Splash blocks placed. Walkthrough with you to confirm color match, downspout placement, and any specific concerns. Final invoice.
Frequently asked
Do I need to be home?
No — we just need driveway access. You can be at work all day. We'll text photos when done.
Is it noisy?
Coil machine and hammer drills make moderate noise. Comparable to a lawn-care crew. Worst noise is the 1-2 hours when old gutters are being pulled.
What about my landscaping?
We tarp delicate beds during install. Most damage risk is from ladders — we use foam stand-offs to avoid scraping fascia.